Superstructure

15th July 2022, 81 photos.

The steel frame was installed and the concrete slab poured. Then the timber rear section and its roof and the external and internal walls were constructed. Finally the main roof deck was fitted to the top of the steel.

15th July 2022, 81 photos. View this album in Flickr